Here's what's happening on the routes around our community, according to the Orange County Transportation Authority.
The SB I-605 to the SB I-405 connector will reopen by 7 a.m. on Saturday, Aug. 11. After working around the clock for the last 12 days crews will be reopening the connectorto commuters three days ahead of schedule.
NIGHTTIME CLOSURES
THURSDAY NIGHT, AUG. 9
- SB I-605 to the SB I-405 Connector
- DETOUR(S): For recommended detours click here.
- SB I-405 Freeway between Seal Beach Blvd. and Bolsa Chica Rd. (Closed from midnight, Thursday, Aug. 9 to 5 a.m., Friday, Aug. 10)
- DETOUR: From the SB I-405 exit Seal Beach Blvd. and turn left, proceed south and turn left on Westminster Ave., continue east to access the SB I-405 freeway on-ramp or turn left on Bolsa Chica Rd, then right on Garden Grove Blvd. to access the EB SR-22 freeway on-ramp
- SB I-405 to EB SR-22 Connector (Closed from 11 p.m. to 5 a.m.)
- DETOUR: From the SB I-405 exit Studebaker Rd. (stay in the right lane) and proceed south, turn left on Westminster Ave. and continue east to access the SB I-405 freeway on-ramp or turn left on Bolsa Chica Rd., then right on Garden Grove Blvd. to access the EB SR-22 freeway on-ramp
- SB I-405 Bolsa Chica Rd. On-Ramp (Closed from 10 p.m. to 5 a.m.)
- DETOUR: From Bolsa Chica Rd. turn left on Westminster Ave. and proceed east to access the SB I-405 freeway on-ramp
- NB I-405 to NB I-605 Connector (Closed from 11 p.m. to 5 a.m.)
- DETOUR: From the NB I-405 exit Seal Beach Blvd. and turn right, proceed north on Seal Beach Blvd. / Los Alamitos Blvd., then turn left on Katella to access the NB I-605 freeway on-ramp
- EB SR-22 to NB I-405 / NB I-605 Connector (Closed from 11 p.m. to 5 a.m.)
- DETOUR: From the eastbound SR-22 take the Studebaker Rd. exit and turn right, continue north on Studebaker Rd. to access the NB I-405 freeway on-ramp OR continue north on Studebaker Rd. and turn right on Willow St. to access the NB I-605 freeway on-ramp
- EB SR-22 Studebaker Rd. On-Ramp (Closed from 10 p.m. to 5 a.m.)
- DETOUR: From Studebaker Rd. proceed south and turn left on Westminster Ave., continue east on Westminster Ave. to access the SB I-405 freeway on-ramp OR turn left on Bolsa Chica Rd., then turn right on Garden Grove Blvd. to access the EB SR-22 freeway on-ramp
FRIDAY NIGHT, AUG. 10
- SB I-605 to the SB I-405 Connector (Connector will reopen by 7 a.m. on Saturday, Aug. 11)
- DETOUR(S): For recommended detours click here
- EB SR-22 to NB I-405 / NB I-605 Connector (Closed from 11 p.m. to 5 a.m.)
- DETOUR: From the eastbound SR-22 take the Studebaker Rd. exit and turn right, continue north on Studebaker Rd. to access the NB I-405 freeway on-ramp OR continue north on Studebaker Rd. and turn right on Willow St. to access the NB I-605 freeway on-ramp
SATURDAY NIGHT, AUG. 11
- No closures scheduled